Facility upgrades that work around you

Transforming critical infrastructure while operations continue

/05

Secure

/05

Deliver

/05

Work

/05

Clean

/05

Handover

STEP 1: SECURE
Protection before progress

The Challenge

Picture this: contractors arrive Monday morning, and within hours, your facility resembles a construction zone. Dust everywhere.

Noise disrupting operations. Staff and visitors navigating hazards. This scenario doesn’t just disrupt operations; it reflects directly on you. One wrong move at project start puts your reputation at risk and that’s why our first step isn’t about construction, it’s about protecting your success.

The Challenge

Healthcare facilities get appropriate hoarding and filtration. Schools receive child-safe materials meeting education standards. Every barrier is selected to match your facility’s specific needs and protect your professional standing.

Your established traffic patterns continue uninterrupted. We map these before creating clear, safe pathways that maintain operational flow while enabling our work. Emergency access stays clear. Always.

We identify critical areas like server rooms and sterile supplies and shield them appropriately. Dust control measures, including negative air pressure and industrial filters, are implemented. Temporary walls create separation between work and operational areas.

Professional signage guides everyone safely. Clear directional markers prevent confusion about access routes and work zones, reducing the risk of incidents that could impact your management.

Additional lighting and power support safety without overloading your systems. Installations meet facility standards and operational requirements.

The Challenge

Other contractors rush to start visible work. We invest time in a proper protection setup. Over 25 years and 200+ sites, this systematic approach has proven effective in maintaining operations during refurbishments.

CONTINUE TO DELIVER PHASE